Issue Title
 
Vol 1 , No 1 ( 2019 ) Index function analysis method. interlayer Thickness. transition time from Open Pit. underground mining considering Slope stability Abstract   PDF
Zhixin Liu
 
Vol 2, No 1 (2020) Mechanism of formed-reinforcement in last roadway for pillar in the fully-mechanized gob-side entry Abstract   PDF
Zhang Hongwei, Zhijun Wan, Yuan Zhang
 
Vol 4, No 1 (2022) Study. movement characteristics, "re-stabilization" conditions. overlying key stratum structure after losing stability Abstract   PDF
Nan Li
 
Vol 3, No 1 (2021) Study on Lateral compression deformation and constitutive relation of filling body Abstract   PDF
Lifei Li
 
Vol 5, No 1 (2023) TrtApplication of advanced water exploration technology in an iron mine roadway Abstract   PDF
Shuhan Hu
 
1 - 5 of 5 Items