| Issue | Title | |
| Vol 1 , No 1 ( 2019 ) | Index function analysis method. interlayer Thickness. transition time from Open Pit. underground mining considering Slope stability | Abstract PDF |
| Zhixin Liu | ||
| Vol 2, No 1 (2020) | Mechanism of formed-reinforcement in last roadway for pillar in the fully-mechanized gob-side entry | Abstract PDF |
| Zhang Hongwei, Zhijun Wan, Yuan Zhang | ||
| Vol 4, No 1 (2022) | Study. movement characteristics, "re-stabilization" conditions. overlying key stratum structure after losing stability | Abstract PDF |
| Nan Li | ||
| Vol 3, No 1 (2021) | Study on Lateral compression deformation and constitutive relation of filling body | Abstract PDF |
| Lifei Li | ||
| Vol 5, No 1 (2023) | TrtApplication of advanced water exploration technology in an iron mine roadway | Abstract PDF |
| Shuhan Hu | ||
| 1 - 5 of 5 Items | ||
