|
Issue |
Title |
|
Vol 1 , No 1 ( 2019 ) |
Index function analysis method. interlayer Thickness. transition time from Open Pit. underground mining considering Slope stability |
Abstract
PDF
|
Zhixin Liu |
|
Vol 2, No 1 (2020) |
Mechanism of formed-reinforcement in last roadway for pillar in the fully-mechanized gob-side entry |
Abstract
PDF
|
Zhang Hongwei, Zhijun Wan, Yuan Zhang |
|
Vol 4, No 1 (2022) |
Study. movement characteristics, "re-stabilization" conditions. overlying key stratum structure after losing stability |
Abstract
PDF
|
Nan Li |
|
Vol 3, No 1 (2021) |
Study on Lateral compression deformation and constitutive relation of filling body |
Abstract
PDF
|
Lifei Li |
|
Vol 5, No 1 (2023) |
TrtApplication of advanced water exploration technology in an iron mine roadway |
Abstract
PDF
|
Shuhan Hu |
|
1 - 5 of 5 Items |
|